Pilot Project

Phase 1: Founding Landscape

First 5-acre demonstration landscape in Alberta, Canada. A tangible proof of concept for the broader restoration model.

0 acres

Demonstration Landscape

0

Native Trees & Shrubs (up to)

~$0K

Mid-point Budget (CAD)

0 months

Implementation Timeline

Budget Breakdown

$165,500–$236,700 CAD

All estimates based on actual Alberta restoration project costs, current contractor rates, and verified materials pricing. Mid-point approximately $200,000 CAD.

Budget by Category

Loading chart...

Site Planning & Design

$10,000–$15,000

$12,500

6%

Land Preparation

$15,000–$25,000

$20,000

10%

Native Tree Planting

$22,500–$28,700

$25,600

13%

Pollinator Meadow

$10,000–$15,000

$12,500

6%

Wetland Restoration

$30,000–$50,000

$40,000

20%

Food Forest Demo

$15,000–$25,000

$20,000

10%

Trail Network

$10,000–$15,000

$12,500

6%

Outdoor Classroom

$15,000–$25,000

$20,000

10%

Wildlife Structures

$3,000–$5,000

$4,000

2%

Educational Signage

$5,000–$8,000

$6,500

3%

Founding Director

$20,000–$25,000

$22,500

11%

Total Budget

$165,500–$236,700

Tree Planting Strategy

750–900 Native Trees & Shrubs

Species Strategy

Fast-growing pioneers (willow, poplar) mixed with slower-growing natives for long-term forest structure.

Dense Planting Approach

Accounts for 25–30% natural mortality rate, ensuring surviving specimens form a robust, interconnected canopy and understory.

Targeted Irrigation

Two-year establishment period with dripline irrigation for vulnerable species, critical for Alberta’s variable precipitation patterns.

Cost: $22,500–$28,700 CAD

Includes trees at ~$25/tree (supplies + labor), irrigation system, and water costs for establishment.

Native tree planting restoration
Implementation Timeline

12-Month Phased Implementation

A carefully structured timeline ensuring each phase builds on the foundations established by the one before.

Loading chart...
1

Planning & Design

Months 1–2

2

Site Preparation

Months 3–4

3

Planting & Installation

Months 5–7

4

Infrastructure Dev

Months 8–9

5

Programming & Engagement

Months 10–12

In-Kind Volunteer Contribution

Estimated 400–600 volunteer hours • Equivalent value: $12,000–$18,000 CAD

Demonstrating community engagement and strengthening funding proposals.

Learn about the broader funding strategy and how to get involved.